top of page

Charleston Fire Station Headquarters No. 9

City of Charleston   |   Charleston, South Carolina 

The City of Charleston was in need of a new fire station to replace an outdated and undersized existing facility. The new 18,500 square foot, 5-bay station houses two engine companies, a Special Operations Hazmat division, fire department headquarters offices, a multipurpose training room, and department exercise room. The facility is designed as an “essential facility” as per the International Building Code (IBC) and meets 130+ mph wind loads and Seismic Category D earthquake loads. The facility is split programmatically into two zones: the 2nd floor is designated for fire department use and offices & training space for the hazmat functions of the building. The central portion of the building houses the lobby and support spaces allowing for secure entry and observation of all visitors to the building. The building is certified LEED Silver, with sustainable features that includes water harvesting, energy efficient HVAC systems, daylighting strategies, and high recycled materials content.

Our design received an Honorable Mention at the 2011 F.I.E.R.O Fire Station Symposium and a 2014 F.I.E.R.O. Merit Award.

 

 

Read more HERE!

PROJECT TEAM: 

Structural Engineer: 4SE, Inc. 

MEP Engineer: RMF Engineering, Inc. 

Civil Engineer: Hussey Gay Bay

Cost Estimator: C3

LEED Consultant: Crozier Architects

VISIT

1643 Means Street

Charleston, SC 29412

CONTACT

(843) 577.6073

cca@capleacoe.com

  • Facebook
  • Instagram

CONNECT

Copyright © 2024 Caplea Coe Architects, Inc.

All images contained on this web site are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published or broadcast without the prior written permission of Caplea Coe Architects, Inc.

bottom of page